Construction calculators

Free construction calculators for Indian homes: house construction cost, cement, sand, bricks, steel, plaster, tiles and paint, with Indian units and rates.

Planning your house: what to calculate first

Most budget trouble on a house comes from doing the sums in the wrong order. People price tiles before they know what the structure will cost, or buy cement before the drawings are final. Here is a simple order that follows how a house is actually built.

1. Start with the overall cost

Before any material sums, get a rough total with the house construction cost calculator. Enter your built-up area, number of floors and quality of finish, then replace the default rate with quotes from two or three local contractors. This number tells you whether the plan fits your money, and how much home loan you may need. If it does not fit, change the plan now, while it costs nothing.

2. Below ground: digging and foundations

Once your structural engineer has designed the footings, use the excavation calculator to estimate the volume of earth to dig and remove. Then work out foundation and slab volumes with the concrete calculator for cement, sand and aggregate. Use the steel quantity from your engineer's bar bending schedule where you have one, and the steel calculator for an early budget figure.

3. The walls

For masonry, the brick and mortar calculator works out the number of bricks or blocks and the mortar for each wall. Count wall openings honestly, since doors and windows change the total. After that, the plaster calculator gives cement and sand for inside and outside walls.

4. Services and finishes

Plan the stairs early with the staircase calculator, because the riser and tread must fit the floor height you have. Size the overhead or underground tank with the water tank capacity calculator. Finishes come last: tiles for floors and walls and paint for walls and ceilings.

Tips for home-builders in India

  • The calculator does not replace the engineer. Sizes of footings, columns, beams and steel must come from a qualified structural engineer. Use these tools to check quantities and budgets, not to design.
  • Get material and labour quoted separately. A single "per sq ft" rate hides what is included. Ask what grade of cement, which brand of steel and which tiles the rate assumes.
  • Order in stages. Buy cement as the work needs it rather than all at once, so it stays fresh and dry.
  • Keep a written record. Note every delivery against your estimate. Gaps show up early instead of at the end.
  • Allow a buffer. Prices and site conditions change during a build. Keep money aside for what you did not expect.