House construction cost calculator

Enter the built-up area, floors, quality and city. You get the total cost, the cost of each stage from foundation to painting, and how much cement, steel, sand, aggregate and bricks the house needs.

2026 rates for 10 cities, editableStage-wise cost and materialsRuns in your browser
Quality of finish
Typical for Surat, standard: ₹2,150. Typical, edit to your quote.
9 inch brick wall about 5 to 6 ft high: ₹1,200 to ₹1,500 per running ft (typical, edit to your quote).
Architects commonly charge 4% to 6% in mid-size cities. Add your approval charges on top if quoted separately.
Change any value and the result updates instantly.
₹0
total estimated cost
Total built-up area0 sq ft
Construction cost₹0
Compound wall₹0
Architect and approval fees₹0
All-in cost per sq ft₹0
Cost per floor₹0
Cement (50 kg bags)0
Steel (TMT)0 kg

Cost by stage

StageShareAmount

Material quantities (thumb rule, for the whole house)

MaterialQuantityRule used and source range
Cement0 bags0.4 bag per sq ft. Sources: 0.35 to 0.50
Steel (TMT)0 kg4 kg per sq ft. Sources: 3 to 4.5
Sand0 cft1.2 cft per sq ft. Sources: 0.8 to 1.6
Aggregate (20 and 40 mm)0 cft1.35 cft per sq ft. Sources: 1.0 to 2.0
Bricks (9 x 4 x 3 inch)08 per sq ft. Sources: 5 to 10
Quantities are for planning and ordering estimates only. Your structural drawings and bill of quantities decide the real numbers.
Advertisement

How to use the house construction cost calculator

  1. Enter the built-up area of one floor in sq ft. Built-up area is measured to the outer face of the walls, not the carpet area inside. If the floors differ in size, enter the average.
  2. Pick the number of floors. G is a ground floor only, G+1 adds one upper floor, and so on.
  3. Choose the quality of finish and your city. The rate box fills with a typical 2026 rate for that city and quality.
  4. Replace the rate with your contractor's quote if you have one. Every rate here is typical, edit it to your quote.
  5. Tick the compound wall or the fees option if you want them in the total. The stage table and the material list below the result update as you type.

How it is calculated

Total built-up area = area per floor × number of floors
Construction cost = total built-up area × rate per sq ft
Stage cost = construction cost × stage share
Total = construction cost + compound wall + fees

The rate per sq ft is a turnkey rate. It covers the structure, walls, plaster, flooring, electrical and plumbing work with basic fittings, doors, windows, painting and the contractor's labour. It does not cover land, plan approval charges, interiors such as a modular kitchen or wardrobes, a borewell, or GST if your contractor adds it on top.

The compound wall is priced per running foot. The default of ₹1,300 sits inside HouseYog's March 2026 range of ₹1,200 to ₹1,500 per running foot for a 9 inch brick wall about 5 to 6 ft high. The fees option adds a percentage of the construction cost. HouseYog puts architect fees at 4% to 6% in mid-size cities, and the default is 6% so that some approval charges fit inside it.

Stage shares

The stage shares follow Brick&Bolt's June 2026 split for a standard house, for example 10% to 15% for foundation and plinth and 25% to 30% for the structural frame. Their split includes labour inside each stage. Many owners hire civil labour on a separate labour-only contract and buy materials themselves, so this tool pulls labour out as its own line at 25% of the cost for a standard house. That matches JK Cement's 25% to 30% labour share and India Land Converter's labour figure for Vadodara, which is ₹532 of a ₹2,128 rate. Basic houses use 27% labour, because cheaper materials make labour a bigger part of the bill. Premium houses use 20%, with more going to flooring, doors and finishing.

Material thumb rules

Quantities are the total built-up area multiplied by a planning rule per sq ft for an RCC frame house. The value used and the published range behind it are below.

MaterialRule usedPublished range
Cement0.4 bag per sq ft0.35 to 0.45 (Brick&Bolt), 0.40 to 0.48 (InfraLens), 0.40 to 0.50 (HouseYog), 0.43 (Civiconcepts)
Steel4 kg per sq ft3 to 4 (Brick&Bolt), 3.5 to 4.5 (InfraLens, HouseYog)
Sand1.2 cft per sq ft1.2 to 1.6 (Brick&Bolt), 0.8 to 1.0 (HouseYog)
Aggregate1.35 cft per sq ft1.5 to 2 (Brick&Bolt), 1.0 to 1.2 (HouseYog), 1.2 (Civiconcepts)
Bricks8 per sq ft8 to 10 (Brick&Bolt), 7.3 (Civiconcepts), 5 to 5.5 (HouseYog)

Thumb rules vary a lot between sources, especially for sand, aggregate and bricks. AAC or fly ash blocks instead of clay bricks change the brick count completely. For an order you can trust, use the concrete calculator for each slab and footing and the brick calculator for each wall.

Advertisement

Worked example

A G+1 house in Surat with 1,000 sq ft on each floor, standard quality, at the typical rate of ₹2,150 per sq ft.

  • Total built-up area = 1,000 × 2 = 2,000 sq ft.
  • Construction cost = 2,000 × ₹2,150 = ₹43,00,000, or ₹21,50,000 per floor.
  • Stages: foundation 9% = ₹3,87,000, RCC frame 20% = ₹8,60,000, masonry 8% = ₹3,44,000, plaster 5% = ₹2,15,000, flooring 7% = ₹3,01,000, electrical 5% = ₹2,15,000, plumbing 5% = ₹2,15,000, doors and windows 7% = ₹3,01,000, painting 4% = ₹1,72,000, finishing 5% = ₹2,15,000, labour 25% = ₹10,75,000.
  • Materials: 2,000 × 0.4 = 800 bags of cement, 2,000 × 4 = 8,000 kg of steel, 2,400 cft of sand, 2,700 cft of aggregate and 16,000 bricks.

Tick the compound wall with 120 running ft at ₹1,300 and it adds ₹1,56,000. Tick 6% fees and they add ₹2,58,000. The total becomes ₹47,14,000, which is ₹2,357 per sq ft all-in.

Construction cost per sq ft in Surat and other cities (2026)

These are the typical rates the calculator loads, as of November 2026, next to the published figures they come from. All are ₹ per sq ft of built-up area. Typical, edit to your quote.

CityBasic / Standard / Premium (our default)Published standard rangeSources and dates
Surat1,700 / 2,150 / 2,9001,895 to 2,454InfraLens Surat, 22 May 2026: basic 1,679, standard 2,153, premium 2,907
Ahmedabad1,650 / 2,100 / 2,8501,650 to 2,153NoBroker, Nov 2025: standard 1,650 to 1,900. InfraLens, Apr 2026: 2,153
Vadodara1,700 / 2,150 / 2,9002,000 to 2,450InfraLens 2026: 2,000 to 2,450. India Land Converter 2026: 2,128
Rajkot1,600 / 2,050 / 2,7501,802 to 2,335InfraLens, 22 May 2026: average 2,048. India Land Converter 2026: 2,035
Mumbai2,250 / 2,900 / 3,9002,000 to 3,800Brick&Bolt, Jun 2026: 2,000 to 2,500. JK Cement 2026: 2,700 to 3,800. InfraLens, Apr 2026: 3,150
Pune1,750 / 2,250 / 3,0501,600 to 2,573Brick&Bolt: 1,900 to 2,300. JK Cement: 1,600 to 2,300. InfraLens: 2,573
Bengaluru1,800 / 2,300 / 3,1001,800 to 2,800Brick&Bolt: 1,900 to 2,300. JK Cement: 1,800 to 2,800. InfraLens: 2,520
Hyderabad1,650 / 2,100 / 2,8501,600 to 2,500Brick&Bolt: 1,800 to 2,200. JK Cement: 1,600 to 2,500. InfraLens: 2,205
Chennai1,700 / 2,150 / 2,9001,700 to 2,500Brick&Bolt: 1,800 to 2,200. JK Cement: 1,700 to 2,500. InfraLens: 2,363
Delhi NCR1,950 / 2,500 / 3,4001,900 to 3,000Brick&Bolt: 1,900 to 2,400. JK Cement: 2,200 to 3,000. InfraLens: 2,625 (Noida) to 2,835 (New Delhi)

The standard default sits inside every city's published range. Basic is about 0.78 times standard and premium about 1.35 times, the same ratios InfraLens uses, rounded to the nearest ₹50. Older or wider guides quote lower floors. Housing.com, updated October 2025, gives "Rs 1,500 per sq ft and above" for Hyderabad and "Rs 1,700 and above" for Mumbai, so treat any single number as a starting point.

The Surat rates will be refreshed with actual billed costs from the WiserFool team's own construction sites in Surat. Until then they are the published figures above.

What basic, standard and premium mean

  • Basic: plain RCC frame and brick walls, ceramic floor tiles, local brand sanitary and electrical fittings, flush doors, MS or aluminium windows, distemper or basic emulsion paint.
  • Standard: branded cement and TMT steel, vitrified floor tiles, branded CPVC and fittings, wooden or WPC doors, UPVC or good aluminium windows, emulsion paint inside and weatherproof paint outside.
  • Premium: large-format vitrified, granite or marble floors, premium sanitaryware and switches, teak or veneer doors, better window systems, false ceilings in main rooms and textured or premium paints.

Once you know the total, check the steel calculator for the bar weights your engineer specifies, then see what you can borrow with the home loan affordability calculator. Banks usually release a construction loan in stages, so the stage table above doubles as a rough payment plan.

Common questions

What is the construction cost per sq ft in Surat in 2026?

For a standard finish, published 2026 figures for Surat put it around ₹1,900 to ₹2,450 per sq ft of built-up area, with about ₹2,150 as a typical middle. Basic work runs about ₹1,700 and premium about ₹2,900. These cover the structure and normal finishes, not land, approvals, interiors or furniture. Always compare with a written contractor quote.

How much does it cost to build a 1000 sq ft house?

At a typical standard rate of ₹2,150 per sq ft, a 1,000 sq ft ground floor house in Surat costs about ₹21.5 lakh. A G+1 house with 1,000 sq ft on each floor has 2,000 sq ft of built-up area and costs about ₹43 lakh. Change the city, quality and rate in the calculator to match your quote.

How many cement bags are needed for a 1000 sq ft house?

The common thumb rule is about 0.4 bag of cement per sq ft of built-up area for an RCC frame house, so roughly 400 bags for 1,000 sq ft. Published thumb rules range from 0.35 to 0.50 bag per sq ft. Your structural design and the mix ratios decide the real figure.

How much steel is required per sq ft for a house?

For an ordinary RCC frame house the planning figure is 3.5 to 4.5 kg of TMT steel per sq ft of built-up area. This calculator uses 4 kg. Taller buildings, larger spans and poor soil push it up. The structural engineer's bar bending schedule gives the exact weight.

Is G+1 cheaper per sq ft than a single floor?

Often slightly, because the plot, foundation design, site setup and supervision are shared across more area. The foundation itself gets heavier for more floors, so the saving is small. This calculator uses one rate for all floors. If your contractor quotes a lower rate for the upper floor, enter the average rate.

What is not included in the construction cost per sq ft?

Land, plan approval and development charges, architect and engineer fees (add them with the option above), compound wall, borewell, modular kitchen, wardrobes, false ceiling beyond basic, furniture, electrical fixtures beyond basic, and GST if your contractor charges it on top. Ask your contractor for a written list of what the rate includes.

Sources

Made in Surat by WiserFool, the studio of Khanjan Kavani, architect and contractor. Formulas are tested against published references before a tool goes live. Last reviewed 25 November 2026. How we build and check tools.